After going through the sound recordings with the help of the Sound Log I was able to find the majority of the sounds needed for the post production stage on Tuesdays, though there were a few problems, namely that a few of the recorded sounds didn't sound long enough or did fell like it matched the sound that it was supposed to sync with. This mean that we would have to duplicate the sounds ourselves or possibly re record them. This again all depends on what we deem as useful or other wise as we continue to cut down the piece which was still over the limit.
Sound List for Post Production Drama Project
No comments:
Post a Comment